We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Architectural Design.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Architectural Design - List of Manufacturers, Suppliers, Companies and Products

Architectural Design Product List

1~4 item / All 4 items

Displayed results

[Seminar] Environmental-Friendly Architecture Aimed by Sato General Planning Co., Ltd. (AXS)

Innovating through Technology: Its Nature and Examples

We will hold a seminar titled "Environmental Harmony Architecture Aimed for by Sato General Planning (AXS)." Sato General Planning (AXS) is committed to creating environmentally harmonious architecture (urban spaces) that contributes to society, with primary goals of moving towards carbon neutrality, enhancing wellness, and ensuring the continuity (circulation) of functions throughout the building's lifecycle. In these efforts, we place particular emphasis on being "seamless," meaning that carbon neutrality, wellness, and the continuity of functions (ensuring environmental safety during emergencies) are interconnected in a "seamless" manner. This seminar will provide a detailed explanation of the above philosophy and specific initiatives of Sato General Planning (AXS). 【Seminar Details】 ■ Date and Time: September 3 (Tuesday) 13:30 - 15:30 (Doors open at 13:00) ■ Venue: JPI Conference Square ■ Address: 5-2-32 Minamiazabu, Minato-ku, Tokyo, Kowa Hiroo Building ■ Speaker: Fujio Tamura Executive Officer, Project Strategy Office, Principal Head of AXS Future Strategy Office *For more details, please refer to the PDF document or feel free to contact us.

  • Technical Seminar

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Support for the legalization of factory buildings

We will confirm the current legality and propose the necessary steps for construction!

At Yoshizawa Architectural Structural Design, we grasp the current state of buildings based on the know-how we have cultivated over many years, and we undertake a series of tasks aimed at legalization, such as extracting necessary issues for realizing plans and consulting with relevant government ministries. One important consideration when constructing factories, especially during expansions, is compliance issues. The laws regarding construction are very complex, and even minor renovation work can sometimes violate the law. For those who have been turned away by contractors and given up, or for those who have found themselves in violation of building regulations, our company can propose suitable solutions based on our extensive experience and know-how. 【Features】 ■ Planning construction on the current land ■ Carrying out construction without stopping operations ■ Creating buildings that are resistant to earthquakes *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Anti-vibration, earthquake-proof, vibration-isolating devices

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Improving factory productivity: Achieving a comfortable work environment, excellent seismic resistance, and energy savings.

It is possible to carefully implement BCP (Business Continuity Plan) measures so that the factory can continue to operate even in the event of a disaster.

Our company proposes energy-efficient buildings that focus on the "structure" of the building, providing a comfortable working environment while also being resilient to natural disasters with excellent seismic resistance and durability, and consideration for the environment. Additionally, we have many design professionals on staff, allowing us to offer spaces that are both aesthetically pleasing and of high quality. By enhancing comfortable working spaces and welfare facilities that incorporate energy-saving features, we aim to improve work efficiency and also serve as a shelter that protects employees' lives. Moreover, we meticulously implement BCP (Business Continuity Planning) measures to ensure that the factory can resume operations as quickly as possible in the event of a disaster. 【Features】 ■ We propose spaces that are aesthetically pleasing and of high quality. ■ We carefully implement BCP (Business Continuity Planning) measures to ensure the factory can operate even in the event of a disaster. ■ We produce both the hard and soft aspects of the factory. *For more details, please refer to the PDF materials or feel free to contact us.

  • Contract manufacturing
  • Other contract services
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Factory and Warehouse Construction Schedule

It is recommended to allow ample time when making a request to ensure it is completed by the desired deadline.

We would like to introduce the construction schedule and required duration until the completion handover of the factory and warehouse. The average duration is approximately 14 to 30 months. After your inquiry, we will conduct a hearing for the plan and confirm the site. In the second month, we will carry out the building scale and plan, as well as the design contract. Following that, we will go through the basic plan, estimates, ground surveys, detailed design, and construction management, leading to the completion handover after the 14th month. We recommend allowing ample time when requesting to ensure it aligns with your desired completion date. 【Construction Schedule】 ■ Start: Hearing for the plan / Site confirmation ■ 2nd month: Building scale and plan / Design contract ■ 5th month: Basic plan + Estimate / Ground survey / Detailed design / Selection of contractor ■ 9th month: Construction management ■ After the 14th month: Completion handover *For more details, please download the PDF or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration